1 / 5
Construction site equipment: hammer drills and various pallet trucks.
- Current bid
- Status
Lot specifications
- Quantity
- 1
- Margin
- No
- Terms of delivery
- Ex foundation-unpackaged
Description
attention! To participate in this auction, a deposit of € 25 is required, which will be withheld until the outcome of the contradictory verification of the state of the places and the prior deposition of safety documentation that can be consulted after the signing of an NDA. The deposit is to be paid by bank transfer to the current account in the name of Surplex Srl. To request further information: m.tosin@tbauctions.com
Lot consisting of various construction equipment, including DEWALT hammer drill, HILTI hose, HILTI rotary hammer, various pallet trucks.
The list drawn up by the expert is attached to this announcement.
The lot includes the following works that must be carried out in this time order no later than 30 days from the award.
The total removal of the goods and correct disposal of the remaining NON-FERROUS materials after removal.
The complete floor cleaning of the respective area.
Access to the site will be allowed only after the delivery of all the documentation necessary for safety on site, according to the regulations in force and the specific provisions of the seller.
Liability insurance is required for any damages.
Surplex will monitor the progress of the work to ensure that the deadlines are met.
ATTENTION: The list was drawn up by the expert delegated for the procedure and did not benefit from further verifications. Any omissions are not attributable to Surplex. It is advisable to proceed with a thorough inspection.
WARNING: all the components of the lot offered for sale are to be considered as sold in an UNVERIFIED state.
Lot consisting of various construction equipment, including DEWALT hammer drill, HILTI hose, HILTI rotary hammer, various pallet trucks.
The list drawn up by the expert is attached to this announcement.
The lot includes the following works that must be carried out in this time order no later than 30 days from the award.
The total removal of the goods and correct disposal of the remaining NON-FERROUS materials after removal.
The complete floor cleaning of the respective area.
Access to the site will be allowed only after the delivery of all the documentation necessary for safety on site, according to the regulations in force and the specific provisions of the seller.
Liability insurance is required for any damages.
Surplex will monitor the progress of the work to ensure that the deadlines are met.
ATTENTION: The list was drawn up by the expert delegated for the procedure and did not benefit from further verifications. Any omissions are not attributable to Surplex. It is advisable to proceed with a thorough inspection.
WARNING: all the components of the lot offered for sale are to be considered as sold in an UNVERIFIED state.
Additional details
All collections are to be understood ex works (EX WORKS), with own means and to be agreed by appointment.
The removal times provide for a time frame of a maximum of 30 days from the first access.