1 / 12
GARANT - Workbench including contents suitable for die-sinking EDM machine
- Current bid
- Status
€
Total bid amount
See total breakdown
Total bid amount
See total breakdown
€
Max bid amount
See total breakdown
Max bid amount
See total breakdown
Lot specifications
- Quantity
- 1
- Margin
- No
- Brand
- GARANT
- Width
- 700mm
- Weight
- 50kg
- Length
- 2000mm
- Height
- 1810mm
- Terms of delivery
- Loaded on truck
Description
Technical data
GARANT workbench with drawer cabinet and rear frame.Version: heavy industrial version with wooden worktop
Drawers: multi-pull-out tool drawers
Application: Accessories and tool workstation for die-sinking EDM machine
Configuration
Assortment of tools / accessories for die-sinking EDM machine:- Various measuring equipment and dial gauges
- Precision measuring and adjustment tools
- Electrode and clamping accessories
- Collets and small parts assortments
- Electrode rods / copper electrodes
- Clamping screws and fastening material
- Hand tools and assembly tools
- Threading and precision tools
- Various mounts and mounts
- Small fixtures and adapter parts
- Tool and small parts boxes
Scope of Delivery / Notes
Included: visible content according to photo documentationWithout: overlying clamping aids (Lot No. 25 / 26)
Without: HIRSCHMANN Clamping Elements (Lot No. 19)
Additional details
Viewing:
16.06.2026
Please only by appointment at project.de@surplex.com
Pick-up period:
29.06. – 03.07.2026 (by appointment only)
(Pallet goods and light items can be picked up as early as 23.06.2026)
Please note that all items are sold used and untested unless expressly stated otherwise. The respective article description is decisive.
For detailed information on warranty and guarantee conditions, please refer to the auction conditions.
Note: Late or missed pickup may incur additional storage, handling, or disassembly costs that are the responsibility of the buyer.
All dismantling and loading costs shown in the auction are valid exclusively on the condition that the collection takes place within the specified collection period and that the dismantling can be carried out according to the dismantling method specified by the commissioned dismantler. Deviations from this caused or required by the buyer, in particular special dates, delays or special dismantling requirements, are not part of the stated costs and will be calculated separately according to effort or individually agreed.