1 / 121

KUSTAN/ CHEOPS/ WATEK - Effluent Plants

Current bid
Status

Total bid amount

See total breakdown

Max bid amount

See total breakdown
Lot specifications
Quantity
1
Margin
No
Brand
KUSTAN/ CHEOPS/ WATEK
Terms of delivery
Ex foundation-unpackaged
Description

Demineralization plant

Technical data

Manufacturer:WATEK
Machine Type:Water Treatment Plant / Demineralization Plant
Model:DEMI 400 L
Capacity: 400 l/h at 12 °C
Operating pressure: 0.8 – 1.5 MPa (8 – 15 bar)
Minimum inlet pressure:0.25 MPa (2.5 bar)
Operating temperature:12 – 25 °C
Max. raw water conductivity:1500 μS/cm
Electrical connection:3+PE+N 50 Hz AC 230/400 V
Installed power:1.6 or 2.3 kW
Degree of protection:IP44
Noise level:69.5 dB(A)
Dimensions approx.:800x550x1630 mm

Kustan B0.1 and B0.2

Technical data

Machine Type:Storage tank / tank for demineralized water
Manufacturer:KUSTAN GmbH
Type:KP-B-5,0-DN1550-2792-G
Year of manufacture:2020
Material:PE 100
Filling volume:5.0 m³
Permissible filling height:2.65 m
Permissible operating temperature:30 °C
Volume flow fill/emptying:72 m³/h
Permissible load value:10 kN/m³
Manufacturing numbers:B0.1-7-190056 and B0.2-7-190056
Diameter per container approx.:1400 mm
Total height per container approx.:3250 mm
Control cabinet dimensions approx.:800 x 1000 x 380 mm

Kustan without a number

Diameter approx.:2000 mm
Total height per container approx.:3000 mm

Acron container

Diameter approx.:1000 mm
Total height per container approx.:1570 mm

Bottling plant

Technical data

Machine Type:Bottling plant
Execution:Special construction
Documentation:CHEOPS
Supply Voltage:3x400V TN-S
Frequency:50Hz
Rated Current:20 A
Connected load:4.5 kVA
Short-circuit current:17 kA
Degree of protection:IP54
Control voltage:24 VDC
Dimensions approx.:8200x5400x3000 mm
Remarks
Unaudited
Additional details
The system must be completely and professionally dismantled by the buyer. All pipelines, cables, cable trays, connections, brackets, fastenings and other media routing belonging to the system must be completely dismantled and removed by the buyer. Dismantling, loading and transport are carried out exclusively at the expense, risk and responsibility of the buyer. There are no loading aids on site. Before submitting a bid, the buyer must independently inform himself about the condition, completeness, dimensions, weights, dismantling effort and technical conditions. Any parts of the building, wall or hall installations as well as components not expressly described are not necessarily included in the scope of delivery. No guarantee is given for the completeness of technical documents, software, PLC programs, parameterizations or documentation. Sale exclusively in accordance with the auction conditions of the auction house. Viewing: A viewing before bidding is expressly recommended.
Documents

More from the same auction

View all

Download the Surplex app now!

App storeGoogle play