1 / 63
MEKAR - Air cooling system - 2019
- Current bid
- Status
Total bid amount
See total breakdown
Total bid amount
See total breakdown
Max bid amount
See total breakdown
Max bid amount
See total breakdown
Lot specifications
- Quantity
- 1
- Margin
- No
- Brand
- MEKAR
- Year of build
- 2019
- Terms of delivery
- Ex foundation-unpackaged
Description
Composed of
Chiller DOMINO HP XEA 165 Z H LN B2
CODIVARI
Boiler Structure
and piping SCHNEIDER
control panel To be repaired, a quote of € 3,500.00 available
Chiller DOMINO HP XEA 165 Z H LN B2
CODIVARI
Boiler Structure
and piping SCHNEIDER
control panel To be repaired, a quote of € 3,500.00 available