1 / 10
STILL Tugger Train LiftRunner AVE - YOC 2025!
- Current bid
- Status
€
Total bid amount
See total breakdown
Total bid amount
See total breakdown
€
Max bid amount
See total breakdown
Max bid amount
See total breakdown
Lot specifications
- Quantity
- 1
- Margin
- No
- Brand
- STILL
- Type
- LiftRunner AVE 2000
- Year of build
- 2025
- Terms of delivery
- Loaded on truck
Description
Technical data
Manufacturer: STILLItem Type: Tugger Train/Transport Trolley System
Year of manufacture: 2025 (estimated, based on delivery date June 2025)
Application: Intralogistics / internal material transport
Design: multi-part transport trolley system with trailer/wagon train
Configuration
Weather protection/tarpaulin structure availableSeveral mounting places for transport trolleys or trolleys
Robust steel construction
Drawbar/coupling area available for train operation
Industrial version for use in warehouse and production environments
Description
STILL transport trolley system for internal material flow. The system is designed as a multi-part tugger train or trailer train and is suitable for transporting trolleys, goods containers or similar load units. A large-scale tarpaulin superstructure, stable chassis modules and a coupling area for train operation are visible. Year of construction 2025.Additional details
Viewing: 11.06.2026
Please only by appointment at project.de@surplex.com
Pick-up period:
Lot 1, Lot 3, Lot 6-11: 22.06.-03.07.26
remaining positions in August/September
Please note that all items are sold used and untested unless expressly stated otherwise. The respective article description is decisive.
For detailed information on warranty and guarantee conditions, please refer to the auction conditions.
Note: Late or missed pickup may incur additional storage, handling, or disassembly costs that are the responsibility of the buyer.